Keston Frame & Header Kits Manual de Instalação Página 16

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 20
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 15
16
Keston Heat - Frame & Header Kits
6.2 BOILER MOUNTING
7 HEADER KIT ASSEMBLY
7.1 FITTING MIXING HEADER AND BLANKING FLANGES
1. Fit the mixing header and blanking anges in the chosen positions, with the bolts, washers and seals supplied.
Note. Mixing header can be located either LHS or RHS of the headers.
1
Mixing Header Blanking Flange
2. Ensure the two boiler bottom xing brackets
are screwed to the frame or wall.
2
1. As appropriate mount the boilers onto either the wall plates or the side
by side frame kit.
Vista de página 15
1 2 ... 11 12 13 14 15 16 17 18 19 20

Comentários a estes Manuais

Sem comentários